Customization: | Available |
---|---|
Application: | Oil and Gas Industry, Water Treatment Plants |
Certification: | CE |
Still deciding? Get samples of US$ 31/Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
USUN Brand Model : G2012316 9/16'' OD x 20000 psi Seamless Ultra high pressure stainless steel 316
tube for water testing
When tighten the nut(right -hand)compression nut, screw sleeve and pipe through the left hand thread connection(anti-loosingpurpose)forcing pipe at the front end of the conical surface(59" 0/-2")pressed the valve cone(60"yby tightening the two conical metal linecontact seal, it can be installed and dismounted repeatedly by fine tuning screw sleeve on the steel pipe position is reached
High pressure tube details :
USUN supply Medium & High pressure tubing for cold drawn 1/8 hard condition.
Working pressure as 10000psi, 20000psi, 40000psi, 60000psi, 100000psi.
High pressure tubes for a variety of high-pressure applications using liquid or gas as the
pressure medium, such as hydraulic installations, test benches, waterjet cutting equipment and Hydrogen stations.
High pressure tubes are characterized by high yield strength and high tensile strength in combination with high elongation. The
pressure resistance is guaranteed by the very smooth inside surface. Coned and threaded nipples also available upon request.
High pressure Nipples :
USUN can provide coned and thread nipples for easy fluid testing system setup.
Features:
(1)Using stainless steel 316 cold material for excellent corrosion resistant
(2)Can be ordered one side and both sides types &Please let us know the length you need when order it.
(3)0ur products Generally are produced with Stainless steel materials, but they can be manufactured with other materials on demandso that variousand qases can be used,.
UItra high pressure tubing processing steps:
UItra high pressure real photos:
Appliictins:
Shipping
By sea | Cheapest but longest option 18~30 days by sea delivery for mass shipment |
By air | More expensive than sea delivery, But cheaper than express 5~7 days by air to airport. |
By express | door to door service,the fastest and most expensive one, 3~5 day for DHL /Fedex /UPS/TNT express |